Methanol Plant, Point Lisas, Trinidad
   
Type of Plant : Methanol Plant
Location : Point Lisas, Trinidad
Contract Period : July 1992 - november 1993
Owner : Caribbean Methanol Company, Trinidad
Main contractor : Proman GmbH, Germany
Consortium Partners : Davy Mckee, United Kingdom
Scope of Work : Turnkey thermal insulation material supply and site erection work to equipment ducting, piping, reformer piping and burner air mains.
Insulation Materials : Mineral wool insulation and aluminised steel cladding. Ceramic fibre insulation was used for the high temperature reformer pigtall piping.
Peak Manpower Strength : 150 Staff and Workers
Remarks : The Site work was carried out with a 100% local Trinidadian labour force under Insultec's expatriate site management and supervisory team. Insultec was responsible for the erection and dismantling of all scaffolding in compliance with local and client safety standards.