| Type of Plant : |
Fertilizer Complex |
| Location : |
Tedjen, Turkmenistan |
| Contract Period : |
October 2003 to March 2004 |
| Owner : |
Turkmenistan Government |
| Main contractor : |
Gap Insaat |
| Scope of Work : |
Detailed engineering, design and supply of thermal
insulation materials, cladding and accessories |
| Production Capacity : |
380,000t urea per annum
200,000t ammonium per annum |
| Remarks : |
The real challenge of this project was arranging
transport of materials to this remote location. |