Type of Plant : |
Coal Fired Power Plant (2 x 660 MW) |
Location : |
Tanjung Jati, Central Java, Indonesia |
Contract Period : |
July 2004 to December 2004 |
Owner : |
Sumitomo for PLN |
Main contractor : |
Babcock & Wilcox, USA |
Scope of Work : |
Supply of insulation materials for the boilers. Over 160
ocean going containers were shipped to site. |
Insulation Materials : |
Mineral Wool, refractory, aluminum jacketing and
ancillaries. |
Remarks : |
Detailed material takeoffs were done with technical
advisor sent to site. An installation manual was
supplied. |