Coal Fired Power Plant, Tanjung Jati, Central Java, Indonesia
   
Type of Plant : Coal Fired Power Plant (2 x 660 MW)
Location : Tanjung Jati, Central Java, Indonesia
Contract Period : July 2004 to December 2004
Owner : Sumitomo for PLN
Main contractor : Babcock & Wilcox, USA
Scope of Work : Supply of insulation materials for the boilers. Over 160 ocean going containers were shipped to site.
Insulation Materials : Mineral Wool, refractory, aluminum jacketing and ancillaries.
Remarks : Detailed material takeoffs were done with technical advisor sent to site. An installation manual was supplied.